You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Longsor Jalan J Mulai Diperbaiki

Collapsed Retaining Wall on Jl. J Kebon Jeruk is Repaired

Kebon Jeruk Water Resources (SDA) Unit repaired collapsed retaining wall on Jl. J, RW 12, Kebon Jeruk Urban Village, Kebon Jeruk, West Jakarta. This repair work was targeted to finish until the next three weeks.

The damaged part is as long as 33.5 meters with channel's width 80 centimeters

Kebon Jeruk Sub-district SDA Unit Head, Suprapto stated, repair was carried out to follow up resident's report through CRM application.

Repair on Retaining Wall and Embankment of Cipinang River in Kelapa Dua Wetan is Completed

"Its condition is already collapsed and its debris clogged the channel. In this channel, water flows to Pesanggrahan River," he explained, Friday (6/25).

In order to repair it, his side deployed 12 personnel from Kebon Jeruk Sub-district SDA Unit.

"The damaged part is as long as 33.5 meters with channel's width 80 centimeters," he conveyed.

With this repair, he hoped buildings above the channel can be safe and water can flow better.

"We hope it will not collapse again. We also expect water to flow well in this channel," he mentioned.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1590 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1440 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1304 personFolmer
  4. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye967 personDessy Suciati
  5. MRT Phase 2A Northbound Tunnel Excavation Completed

    access_time09-07-2026 remove_red_eye845 personAldi Geri Lumban Tobing